Bathroom Vacuum Sucker Moulding Plastic Toilet Towel Mop Hook Hanger Injection Mould
Basic Info
Model NO. | SWY0156 |
Warranty | 3 Years |
Shaping Mode | Injection Mould |
Surface Finish Process | Mirror Polishing |
Mould Cavity | 12 |
Plastic Material | PP |
Process Combination Type | Compound Die |
Application | Commodity, Home Use, Hook |
Runner | Cold Runner |
Design Software | UG |
Installation | Fixed |
Standard | DME |
Customized | Customized |
After-sales Service | Lifelong |
Mould Steel | 718h |
Mould Base | C50 |
Demouding Method | Drop Automatically |
Gate System | Submarine Gate |
Lead Time | 40 Days |
Transport Package | Wooden Box |
Trademark | SWY MOULD |
Origin | Taizhou Huangyan |
HS Code | 8480719090 |
Production Capacity | 500 Sets/Year |
Packaging & Delivery
Package size per unit product 20.00cm * 16.00cm * 26.00cm Gross weight per unit product 230.000kgProduct Description
Mould NameBathroom Vacuum Sucker Moulding Plastic Toilet Towel Mop Hook Hanger Injection Mould
If you need more plastic sanitary ware mould, please click here; for more information, please contact us.
Mould Specifications
Part Resin | PP |
Mould Steel | 718H |
Mould Base | C50 |
Mould Cavity | 12 |
Gate System | Submarine gate |
Injection System | Cold runner |
Demoulding Type | Ejection pins |
Lead Time | 40 days |
Moulding Method | Drop automatically |
Product &. Mould Design
What is a good mould? It must have good quality to meet production requests stable and smoothly, and no need to spend too much time & cost on maintenance and repair.
A good mould design is a critical start. SWY MOULD has 6 designers in total with more than 10 years of experience, they always pay special attention to customers' specifications and details by thinking about the cost-saving solution based on stable and good quality. Their years of experience in exporting moulds gives them great knowledge of global mould standards and quality demands.Software related:
Mould Flow: Mould Flow Analysis
3D Modeling: Pro/Engineer, Unigraphics, Solidworks
2D Drawing: Auto-CAD, E-drawingThe following international data format works OK for us:
2D drawing files: dwg, dxf, edrw
3D drawing files: step, Igs, X-T, prt, sldprt
Final Product &. MouldShipment of plastic injection mould in SWY1. After we get our customer's confirmation for shipment, we attach a plate to the mould: this shows the product's serial number, production year, and mould information.
2. At this stage we paint the mould with anti-rust oil, and then we wrap it safely in a plastic bubble bag for protection.
3. We nail the package as necessary to ensure that mould reaches customers safely.
4. We put the package in a wooden case to protect it during shipping.
5. We nail the wooden case carefully and stick the marks to ensure that mould reaches customers safely and quickly.
6. For any other points that need to pay attention to we will make a file and print it, and send it with mould together.
The Process Of Making A Plastic Injection Mould With SWY MOULD
About Our Taizhou Saiweiyue Mould & Plastic
1. Specialized in plastic injection mouldsTaizhou Saiweiyue Mould & Plastic is specialized in manufacturing injection moulds and plastic products, which is located in Huangyan District, Taizhou City, the China mould town. All of the moulds are designed by our professional technicians using UG, Pro/E software, and a whole set of advanced and mature technology in CAD/CAE/CAM. We have mould technicians with working experience of more than 20 years, who have been making different kinds of moulds. Besides, we are willing to act as an agent for you in producing plastic parts.2. Equipped with full tooling machinesSWY Mould has advanced tooling equipment in order to make sure our mould quality and mould precision. We have 5-axis High-Speed CNC Milling Machines, Gantry High-Speed CNC Milling Machines, Large/middle/small Die Spotting Machines, CNC High-Speed Engraving Machines, Mirror Electric Spark(EDM), Precision Electric Spark(EDM), Slow-feeding Wire-cutters Machines, Medium-feeding Wire-cutters Machines, Precision Grinding Machine, Drilling Machine, etc. We hold the belief that high-precision tooling equipment can make sure mould quality. We not only provide technical support for our customers but also offer them a complete solution in the plastic injection moulding industry.3. Having a nice environment in the workshopWith the principle of 5S(SEIRI, SEITON, SEISO, SETKETSU, SHITSUKE), our workshop environment is kept clean, and all the tools and parts must be put in order, and everything is under a very good management system. We believe a good working environment can make working more efficient, ensure mould quality, and also fasten mould delivery at the same time.4. Providing good quality mouldsWe promise to offer you top-quality moulds with real-quality steel, strict heat treatment, and serious control. We focus on product and mould construction design and insist on making moulds durable and easy maintenance. For all of our moulds, we use international standard mould spare parts, to ensure complete moulds' accuracy and durability. At the same time, greatly shorten mould delivery and be convenient for mould maintenance and spare part change, such as JunFan cylinder from Taiwan, Japan Daido springs and Korea Samsol springs, Brevini hydraulic motor from Denmark, Misumi, Hasco, DME, etc.We're sincere in inviting your visit, communication and cooperation, and are looking forward to being your excellent mould supplier!
Feedback From SWY Customers
SWY MOULD Common FAQ For Our Customers
Q1: Are you a trading company or mould manufacturer?
A1: We are a mould manufacturer, we have our own mould factory located in Huangyan, Taizhou. We are making plastic injection moulds, also with mould mass production service.
Q2: How to go to your factory?A2: From Shanghai-3 hours by train; from Guangzhou-2 hours by aeroplane; from Wenzhou-1 hour by train; from Ningbo-1 hour by train; from Hangzhou-2 hours by train; our factory to Luqiao airport is around 1 hour, and to Taizhou train station is around 20 minutes.You can send the information about the flight or train to us, we can arrange to pick you up. If needed, we can book a nice hotel at a reasonable price for you first. Welcome to contact us, and we will offer you the most thoughtful arrangements.
Q3: How long is your delivery time?
A3: Generally about 35-55 working days, we will fast as soon as possible under the premise of good quality mould.Q4: How about your after-sale service?A4: The mould warranty period is 3 years (without damage caused by human factors or accidents), later for mould-wearing spare parts we can help you purchase and send you.Q5: I have an idea for a new product, but don't know if it can be manufactured, can you help?A5: Yes, sure! We can design and make 3D printing samples for your assembly. After you confirm, we will begin working, if necessary, we will provide a DFM report or Mold-flow analysis.
Q6: Can you help us ship the plastic mould?
A6: Yes, with honour. We have a long-term cooperate shipping company and give you the best price we can get. Also, you can ask your own shipping forwarders, we will help you deal with other documents. SWY MOULD has our own export and import rights, we are familiar with exporting plastic moulds to customers.
SWY MOULD is looking forward to cooperating with you! May we are not the biggest, but we will provide you with better service and better quality mould. We will help you solve problems to save time & money and also earn more money back.